| Obristvi hydropower station is situated approximately 20 km north of Prague at the river Elbe, prior to it joining the Vltava. In the area of an existing weir, a highly environmentally friendly plant with a small head was built.
Voith Siemens Hydro’s share:
- 2 Kaplan turbines, diameter 3.2 m, 1778 kW
- power house dewatering equipment
- cooling water supply system
- plant utilities and piping systems
- power house crane
|