| The Egasaki hydropower plant utilizes the head from a drinking water treatment plant and was commissioned in 2004.
Voith Fuji Hydro’s share:
2 micro hydro generating units (2 x 90 kW), which were installed on one pipeline in series. These micro units consist of bulb turbines, induction generators and control units. They are assembled in one standardized package. |