| The run-of-river power plant is located in the area Montafon, Vorarlberg. Is was constructed and erected in 1992 – 1993.
Technical data:
Head water level: 1450 m a.s.l. Gross head: 420 m Design discharge: 0.50 m³/s Installed capacity: 2,400 kVA Annual energy generation: 8.1 GWh
Voith Siemens Hydro’s share:
Turn key contract which included
- general and final design of the entire power plant
- civil works
- penstock
- crane
- 1 Pelton turbine
- hydraulic steel structures
- generator, transformers, protection, AC/DC system
- 20 kV medium voltage system
- 400 V low voltage system
- instrumentation and control equipment
|