| The run-of-river hydropower station Osanica is close to the place where the river Osanica flows into the Drina. Osanica was completed in 1998. It has a separate powerhouse and an underground penstock. Both machine sets are fully capable of “island” operation.
Technical data:
Net head: 72,8 m Nominal discharge: 1,80 m³/s Nominal output: 2 x 640 kVA Annual production: 4,75 GWh
Voith Siemens Hydro’s share:
Turn-key contract, consisting of:
- feasibility study
- 2 Francis turbines
- 2 generators, transformers, AC/DC system
- 25 kV medium voltage system
- 400 V low voltage system
- instrumentation and control equipment
|