Riksheimdal, Norway

Sykkylven Energi AS

Riksheimdal utilizes the water between an existing water reservoir and an old small-hydro power plant.

Voith Siemens Hydro was awarded the turnkey contract, including 3 000 m of penstock and a power house. Together with Nord-Trondelag Energiverk (NTE), Voith Siemens Hydro installed a state-of-the-art electro-mechanical package and an innovative power house. As the original impression of the landscape had to be preserved, the power house was built as a traditional timber log house with a grass roof which blends into the surrounding area. The highly optimized iron penstock was laid in a trench covered by soil, and will thus be invisible to local trekkers.

Technical data:

Net head: 380 m
2 jet horizontal Pelton turbines
4.6 MW turbine output
5.0 MVA generator output

Commissioning date: December 2003